Technology That Delivers for Industry.

Industrial Confidence

Where Innovation Meets Proven Performance

Industrials need heat that’s clean, reliable and cost-effective. Our technology delivers exactly that for high grade heat applications between 150–550°C.

Unlike repurposed rocks, sand or refractory, MGA Blocks are engineered to offer superior thermal performance, long service life, and a low total cost of ownership. Their ability to store large amounts of energy makes them uniquely effective for continuous, high-demand industrial applications.

MGA Blocks are a building block of our Electro-Thermal Energy Storage (ETES) system which is largely built from standard, readily available industrial components. This approach simplifies integration and accelerates deployment. The charge rate, steam output, and storage capacity of the ETES system is configured for the customer use case.

By combining novel materials with proven industrial hardware, we deliver a storage solution that is both advanced and practical. This gives customers a commercial pathway to electrify heat, reduce emissions, and strengthen operational resilience.

How it Works

MGA Blocks

MGA Blocks are an advanced composite ceramic, purpose engineered for superior thermal performance and lowest cost.

MGA blocks deliver:

  • High-grade process heat, From 1500C to 5500C
  • Energy density, Compact footprint
  • Thermal conductivity, Rapid, low-cost charging
  • Low degradation, 20+ year lifetime

MGA Blocks deliver

  • High-grade process heat: From 150C to 5500C0
  • Energy density: Compact footprint
  • Thermal conductivity: Rapid, low-cost charging
  • Low degradation: 20+ year lifetime

MGA Blocks deliver:

High-grade process heat > From 1500C to 5500C

Energy density > Compact footprint

Thermal conductivity > Rapid, low-cost charging

Low degradation > 20+ year lifetime

How it Works

Electro-Thermal Energy Storage System (ETES)

Built for industrial and manufacturing applications. Uses standard, readily available process equipment, simplifying integration and accelerating deployment.

  • Modular blocks: Scaled to meet the required storage capacity
  • Mild steel enclosure: 95% round-trip efficiency, low thermal losses, cost effective materials
  • Hot swappable heating elements: Precise temperature control, low electrical losses
  • Decoupled steam generation right sized for the customer: Simultaneous charge discharge, available 24/7
  • Distributed Control System (DCS) or a Programmable Logic Controller (PLC) compatible: Seamless operation and integration
  • Modular blocks: Scaled to meet the required storage capacity
  • Mild steel enclosure: 95% round-trip efficiency, low thermal losses, cost effective materials
  • Hot swappable heating elements: Precise temperature control, low electrical losses
  • Decoupled steam generation right sized for the customer: Simultaneous charge discharge, available 24/7
  • Distributed Control System (DCS) or a Programmable Logic Controller (PLC) compatible: Seamless operation and integration

MGA Blocks deliver:

High-grade process heat > From 1500C to 5500C

Energy density > Compact footprint

Thermal conductivity > Rapid, low-cost charging

Low degradation > 20+ year lifetime

How it Works

Delivered at Scale Today

Ready for deployment at industrial scale. Available 24x7 for energy intensive use-cases. Providing a pathway to eliminate fossil fuel use for process heating.

  • Scalable to gigawatt hours               
  • Robust and reliable industrial design 
  • Economies of scale                
  • Grid friendly & flexible    
  • Compact footprint
  • Scalable to gigawatt hours               
  • Robust and reliable industrial design 
  • Economies of scale                
  • Grid friendly & flexible    
  • Compact footprint

MGA Blocks deliver:

Scalable to gigawatt hours

Robust and reliable industrial design

Economies of scale

Grid friendly & flexible

Compact footprint

Connect with us to see what is possible

“We’ve proven that industry can get the steam it needs - low-cost, reliable, high-performance - and still hit its decarbonisation targets.”

Alex Post

Chief Technical Officer and Co-Founder, MGA Thermal